Isometric scale model of a freshly graded industrial site with two excavators.
Phase 01
Bare graded lot

Site Selection

Evaluate parcels for power, water, and network adjacency. Grade the land, secure permits, and prepare the pad for a multi-year build.

3 annotations
  • Graded Pad
  • Site Access
  • Excavation Fleet
Meridian Infrastructure Platform

Build gigawatt sites,
phase by phase.

Coordinate land, power, and long-lead equipment across a single operating picture — from graded lot to commissioned facility.

Scroll to explore

Phase 1: Site Selection

Evaluate parcels for power, water, and network adjacency. Grade the land, secure permits, and prepare the pad for a multi-year build.

Phase 2: Foundations & Delivery

Coordinate interconnection, track timelines, and manage delivery of major equipment as concrete cures and rebar rises across the footprint.

Phase 3: Construction

Structural steel for the data halls goes vertical. Tower cranes stage lifts while trade partners sequence around a live site.

Phase 4: Enclosure & Commissioning

Buildings are clad, tanks and transformers land, and mechanical systems come online for pre-operational commissioning.

Phase 5: Operations

A fully operational site: data halls online, cooling reservoir circulating, stacks venting, and the grid handshake complete.

What is Meridian

One operating picture for the physical build.

Meridian is the system of record for hyperscale energy and data infrastructure — unifying land, power, procurement, and construction timelines so teams ship sites on schedule.